Florida law requires buildings 40+ years old to be structurally recertified — or face fines, insurance cancellations, and forced closures. We make the entire process fast, simple, and worry-free.
Florida's building safety law — and it's not optional.
Under Florida Statute and Miami-Dade / Broward local ordinances, commercial and residential buildings that are 40 years or older must pass a structural and electrical safety inspection — and then again every 10 years after that.
Since the Surfside collapse of 2021, enforcement has intensified dramatically. Thousands of buildings are now on the radar of county inspectors.
The consequences of missing your recertification deadline are serious — and they escalate fast.
Counties can levy fines of $500 to $5,000 per month until the recertification is completed and filed — with no cap on accumulation.
Many insurance carriers are now requiring proof of recertification. Non-compliant buildings risk being dropped mid-policy — leaving you completely exposed.
In severe cases, the county can issue a Notice of Unsafe Structure — ordering all occupants out and padlocking the building until the process is complete.
Liens, open permits, and compliance violations appear on title searches and can kill deals, refinancing, and rental agreements before they close.
If someone is hurt in a non-certified building, liability exposure skyrockets. Plaintiffs will point directly to the missed recertification as proof of negligence.
HOA boards, condo associations, and commercial tenants are increasingly demanding proof of certification — and can terminate leases without it.
We handle the complexity. You just need to answer a few questions and let us do the rest.
Fill out our form below. We review your building details and provide a clear, no-surprise quote — usually within 24 hours. No jargon, no pressure.
Our licensed engineer coordinates a site visit and reviews your existing construction documents, prior inspection records, and county files.
We perform the full inspection required by county ordinance — structural components, electrical systems, and life-safety items — and document everything properly.
Our licensed engineer of record signs and seals the official recertification report in the format required by Miami-Dade or Broward County.
We submit the report directly to the county on your behalf and track it to final approval. You receive your official certification — and peace of mind.
Full-service recertification — from first call to county approval.
Complete structural review by Florida-licensed engineers, including foundation, framing, roofing, and envelope systems.
Licensed electrician review of panel, wiring, code compliance, and life-safety systems per current FBC standards.
We prepare, stamp, and submit all required documents directly to Miami-Dade or Broward County on your behalf.
If deficiencies are found, we help you prioritize repairs and coordinate contractors to get compliant — fast.
Missing your original construction documents? We can produce or locate as-built drawings required for the recertification file.
We track your next due date and remind you well in advance — so you never get caught off guard again.
Real results, real buildings, real peace of mind.
"We had no idea our building was overdue. They contacted us, gave us a quote the same day, and had the county report filed within three weeks. Total lifesavers."
"Our insurance broker sent us a letter threatening to cancel our policy. 40YearHelp got us certified in time and we kept our coverage. I can't recommend them enough."
"Straightforward, professional, and they handled every single conversation with the county. I didn't have to do anything except sign the agreement. Worth every penny."
Takes 60 seconds. We'll review your building details and respond within one business day with a clear, flat-rate quote — no surprises.